Work in Progress

Some projects/roadworks may take a bit longer than anticipated to complete due to extended periods of rain, or contractors being unavailable. Current capital improvement projects are listed here. Other minor capital projects may also be underway.

Choose the suburb or area to see all work being undertaken in that area:

Shire Wide

There are no shire wide projects underway at this time.

Black Mountain

There are no capital projects scheduled at this time.

Boreen Point

There are no capital projects scheduled at this time.

Castaways Beach

There are no capital projects scheduled at this time.

Cooran

Location: Pioneer Park

Project: Exciting improvements are coming to Pioneer Park on King Street, Cooran, with playground renewal works set to begin soon. 

Duration: Construction is scheduled to commence on Monday, 15 June, with completion expected in July, weather and site conditions permitting. 

Works will take place during daytime hours between 6:30am and 6:30pm.

During this time, the entire playground area will be temporarily closed to ensure community safety. 

Related documents: Project News(PDF, 1MB)


Location: James Street - Asphalt Works

Project: Contractors will soon commence asphalt reseal work on James Street.

Duration: Work is scheduled to commence 15th June, with completion expected by 19th June, weather and site conditions permitting. 

Works will take place during daytime hours between 6:30am and 6:30pm. 

Related documents: Works Notice(PDF, 297KB)


Cooroibah

There are no capital projects at this time.

Cooroy

Location: Nandroya Road, Cooroy

Project: Following the storm event on 29 March 2025, instability was identified at the edge of Nandroya Road. Interim stability works have been completed to keep two lanes open to traffic. The lane widths through this section are narrow and motorists are advised to drive to conditions.

Investigations into long-term repair options are continuing.

Related document: Works Notice(PDF, 561KB)

Cooroy Mountain

There are no capital projects underway at this time.

Cootharaba

There are no capital projects scheduled at this time.

Doonan

There are no capital projects underway at this time.

Federal

There are no capital projects underway at this time.

Kin Kin

There are no capital projects underway at this time.

Lake Macdonald

Location: Fig Tree Lane - Asphalt  Works 

Contractors will soon commence asphalt works on Fig Tree Lane.

Work was scheduled to commence on 22 June 2026 with completion expected by the same day, subject to weather, contractor availability and site conditions.

Related document: Works Notice(PDF, 198KB)

Marcus Beach

There are no capital projects underway at this time.

Noosa Heads

Noosa Heads: Claude Batten Drive - Fencing Replacement Works

Contractors will soon commence fencing replacement works on Noosa Council’s Sand Recycling System infrastructure along Claude Batten Dr (Noosa Woods). Works are proudly funded by Council’s Capital Works budget.

Work is scheduled to commence on Wednesday, 22nd April with completion expected by Friday, 20th June 2026, subject to weather, contractor availability and site conditions. The work will be undertaken during the day between the hours of 6.30am and 6.30pm.

Related documents: Works Notice 
(PDF, 269KB)


Location:  Noosa Parade & Quamby Place - Mulching Night Works

Project: Contractors are engaged to complete roadside and median garden bed mulching on Noosa Parade and Quamby Place.

Start Date: Work is scheduled to commence on Thursday, 21st May with completion expected by Thursday 28th May, subject to weather, contractor availability and site conditions.

Related document: Works Notice(PDF, 219KB) 


Location: Links Drive - Pit Cleaning Drainage Works 

Contractors will soon commence Drainage works on Links Drive.

Work is scheduled to commence on Tuesday the 19th May 2026 with completion expected by Wednesday the 20th May 2026, subject to weather, contractor availability and site conditions. The work will be undertaken during the day between the hours of 6.30am and 6.30pm.

Related documents: Works Notice (PDF, 175KB)

 

 

 

 

 

 

Noosa North Shore

There are no capital projects underway at this time.

 

Noosaville


Location: Pirate Playground All-Abilities  Element Replacement

Project: The Pirate playground liberty swing is at the end of its useful life and will be removed and replaced with inclusive all-abilities play equipment included a trampoline and a carousel.

Duration: Work is scheduled to commence on the 25th May with completion expected within approximately two weeks, subject to weather, contractor availability and site conditions.

The work will be undertaken during the day between the hours of 6.30am and 6.30pm.

Related documents: Project News(PDF, 473KB)


Location: Quota Park, Gympie Terrace, Noosaville

Project: Noosa Council will begin construction of a new accessible and Changing Places accredited amenities facility at Quota Park, Gympie Terrace, Noosaville in late June. The project responds to strong community feedback from the Noosaville Foreshore Infrastructure Master Plan, which identified the need for additional amenities and improved spacing between facilities along the foreshore. Quota Park was selected as the preferred location due to its accessibility, visibility and minimal impact on open space.

Duration: Construction is anticipated to commence late June 2026, with work expected to finish by November 2026, subject to weather and construction conditions. 

Related document: Project News(PDF, 728KB)


Location: Ely Park Revetment Wall, Gympie Terrace, Noosaville

Project: Council contractors will soon begin temporary stabilisation works on a 50-metre section of failing timber revetment wall along Gympie Terrace, adjacent to Massoud’s Slipway and Ely Park.

Duration: Works are scheduled to commence on Tuesday, 7 April 2026 and are expected to be completed by 29 May 2026, subject to weather, contractor availability and site conditions.

Working hours will be 6.30am to 6.30pm, Monday to Friday.

Related document: Works Notice(PDF, 4MB)


Location: Eumundi Noosa Road - Kerb and Channel Night Works

UPDATE 26 May 26: Works have been rescheduled to 1 June 26

Project: Contractors will soon commence kerb and channel works on Eumundi Noosa Road. Asphalt resurfacing works will follow shortly after however an additional notice will be issued.

Duration: Night Works are scheduled to commence on Monday, 1st June with completion expected by the 4th June 2026, subject to weather, contractor availability and site conditions. 

The work will be undertaken during the night between the hours of 6.30pm and 6.30am. 

Related document: Works Notice(PDF, 254KB)


Location: Noosaville, Gibson Service Rd - Drainage Works

Project: Contractors will soon commence drainage works on Gibson Service Road, Noosaville.

Duration: Work is scheduled to commence on Tuesday the 9 th of June 2026 with completion expected by Friday the 12th of June 2026, subject to weather, contractor availability and site conditions.

The work will be undertaken during the night between the hours of 6.30pm and 6.30am. 

Related document: Works Notice(PDF, 278KB)

 

 

 

 

Peregian Beach

There are no capital projects underway at this time.

Pinbarren

There are no capital projects underway at this time.

 

Pomona

Location: Stan Topper Park - Amenities Upgrade

Project: The Stan Topper Park public amenities (N8), located at the corner of Reserve Street and Memorial Avenue in Pomona, are set to undergo an upgrade. During construction, temporary public toilet facilities will be available, including two male and two female portable toilets, which will be serviced daily to maintain public access and cleanliness throughout the works. 

Duration: Work is scheduled to commence 1st June 2026 with completion expected by the 26th June 2026, subject to weather, contractor availability and site conditions.

The work will be undertaken during the day between the hours of 6.30am and 6.30pm. 

Related document: Works Notice(PDF, 235KB)

 

 

 

Ridgewood

There are no capital projects underway at this time.

Sunrise Beach

Location: Sunshine Creek embankment stabilisation 

Project: In March 2026, Noosa Council will be starting reconstruction works to stabilise the Sunshine Creek embankment at Sunrise Beach.

Duration: These works will be finished by June 2026, weather and construction conditions permitting.

Refer to the Sunshine Creek embankment page for updates.


Location: Burgess Creek Mouth Realignment

Project: Contractors will soon commence drainage works on Burgess Creek. 

Duration: Work is scheduled to commence on Thursday the 21st of May 2026 with completion expected by Friday the 22nd of May 2026, subject to weather, contractor availability and site conditions.

Related document: Works Notice(PDF, 298KB)


Sunshine Beach

There are no capital projects underway at this time.

Tewantin

Location: Hilton Esplanade - Street Improvements

Thank you to everyone who participated in the first stage of community consultation for the Hilton Esplanade Improvement Project.

We received extensive feedback and are now reviewing it to help develop the concept designs for the next stage. We look forward to sharing these with you soon.


Location: Doonella Lake Bridge

Project: We're upgrading Doonell Lake Bridge for a safer, stronger connection. Originally constructed in 1968, the bridge plays a critical role in our local transport network, connecting Tewantin and Noosaville and carrying an average of over 20,000 vehicles daily, along with many pedestrians and cyclists.These essential works will improve the bridge’s safety, durability, and accessibility for all road users.

Duration: Set to commence in July 2026, with work expected to finish by early December 2026, subject to weather and construction conditions. 

Related document: Project News(PDF, 522KB)


Location: Prestwick Court - Pedestrian Pathway Concrete Works

Project: Contractors are conducting concrete pathway renewal works on the pedestrian pathway adjacent to #15 Prestwick Court.

Duration: Work is scheduled to commence 25th May 26 with completion expected by 30th May, subject to weather and site conditions.

Related Document: Works Notice(PDF, 230KB)

Tinbeerwah

There are no capital projects underway at this time.