Work in Progress Work in Progress

                                      


Some projects may take a bit longer than anticipated to complete due to extended periods of rain, or contractors being unavailable. Current capital improvement projects are listed here. Other minor capital projects may also be underway.

Choose the suburb or area to see all work being undertaken in that area:

Cooran

Noosaville (includes Doonan)

Cooroy (including Lake Macdonald, Black Mountain & Tinbeerwah)

Peregian Beach (includes Marcus Beach)

Kin Kin

Pomona

Noosa Heads (includes Castaways Beach, Sunshine Beach & Sunrise Beach)

Tewantin (including Boreen Point, Cooroibah, Cootharaba & Noosa North Shore)

 

Shire Wide  
  There are no Shire Wide capital projects underway at this time.
Cooran  
  There are no capital projects underway at this time.
Cooroy  
Location: Black Mountain Road, Black Mountain
Project details:

Work will commence shortly to widen a 200m section of road in front of 378 Black Mountain Road, Black Mountain.

The road widening work involves extensive rock fill, new culverts and new pavement. Access will be reduced to one lane of traffic, with remote traffic signals operating 24 hours a day. Motorists should avoid the area and seek alternate routes if possible.

Start date: 15 May, 2017
Duration: July 2017, weather dependent
Related document:
Kin Kin  
  There are no capital projects underway at this time.
Noosa Heads  
  There are no capital projects underway at this time.
Noosaville  
Location: Gympie Terrace and Thomas Street
Project details:

The existing drainage line between the Noosaville foreshore and along Thomas Street will be replaced in January 2017. Several trees in the foreshore park will be removed and replaced with similar species during the work.

Traffic control will be in place for pedestrian and motorist safety with some kerbside parking bays on Thomas Street closed during the work.

Start date: 26 April 2017
Duration: Completion expected by June 2017, weather dependent
Related documents:
   
Location: Munna Point Foreshore
Project details:

Contractors will commence work in February on construction of stage 2 of the eotextile groyne field at Munna Point. Disruption to users of the foreshore park will be kept to a minimum during construction.

Vessels and other users of the river will need to observe a 30m exclusion zone around the dredging equipment.

Start date: Early February 2017
Duration: Completion in May 2017, weather permitting
Related documents:
Peregian Beach  
Location: Rufous Street, Rufous Laneway and David Low Way
Project details:

Council has awarded the contract for work to begin. Work will include formalising carparks, landscaping, upgrading Rufous Street laneway and pedestrian refuge and crossing work.

Access to all facilities will be maintained with traffic control in place for vehicles and pedestrians.

Start date: 25 January 2017
Duration: Completion by 31 May 2017, weather permitting.
Related documents:
Pomona  
  There are no capital projects underway at this time.  
Tewantin  
  There are no capital projects underway at this time.